Services · SVC-02
Installation
Certified crews, controlled alignment tolerances and third-party load testing at handover.
Overview
Installation is executed by Liftech's own certified crews working to a written lifting plan and method statement. Guide rails are set to ±0.5 mm plumb with DBG held to ±1 mm, machine beds are grouted and torque-verified, and every wiring loom is tested for insulation resistance and earth continuity before energising.
Handover is only signed after a 125% static and 110% dynamic load test, ARD rescue verification, door closing-force measurement and a full-load ride-quality run — witnessed by the client and, where required, a third-party inspector.
Scope of work
- Scaffold, lifting plan and site safety setup
- Rail, bracket, buffer and machine erection
- Landing doors, sills and car assembly
- Controller wiring, adjustment and parameterisation
- Commissioning, testing and operator training
How we deliver
- 01
Mobilisation
Site readiness check, lifting plan, safety induction.
- 02
Erection
Rails, brackets, machine, doors and car assembly.
- 03
Wiring
Controller, travelling cable, shaft signals, safety chain.
- 04
Testing
Load, brake, ARD, closing force and ride-quality tests.