Services · SVC-02

Installation

Certified crews, controlled alignment tolerances and third-party load testing at handover.

SVC-02

Overview

Installation is executed by Liftech's own certified crews working to a written lifting plan and method statement. Guide rails are set to ±0.5 mm plumb with DBG held to ±1 mm, machine beds are grouted and torque-verified, and every wiring loom is tested for insulation resistance and earth continuity before energising.

Handover is only signed after a 125% static and 110% dynamic load test, ARD rescue verification, door closing-force measurement and a full-load ride-quality run — witnessed by the client and, where required, a third-party inspector.

Scope of work

  • Scaffold, lifting plan and site safety setup
  • Rail, bracket, buffer and machine erection
  • Landing doors, sills and car assembly
  • Controller wiring, adjustment and parameterisation
  • Commissioning, testing and operator training

How we deliver

  1. 01

    Mobilisation

    Site readiness check, lifting plan, safety induction.

  2. 02

    Erection

    Rails, brackets, machine, doors and car assembly.

  3. 03

    Wiring

    Controller, travelling cable, shaft signals, safety chain.

  4. 04

    Testing

    Load, brake, ARD, closing force and ride-quality tests.

Frequently asked questions

Need installation in Karachi, Lahore or Islamabad?

Share your building details and our engineers will respond with scope, timeline and pricing.